UPDATE: UBC Traffic & Construction

Visitors to the UBC Aquatic Centre are invited to make note of the below updates related to impacts in the immediate vicinity of the facility over the coming days and weeks:

  • Student Union Blvd / North Parkade Due to the site preparation for the Activate UBC: Recreation Centre North and redesign of Student Union Blvd, please be advised that road construction may result in delays accessing North Parkade;
  • Athletes WayPedestrian access between Student Union Blvd and the UBC Aquatic Centre remains however detours are in place, and may change from day to day.

The Campus community is reminded to respect and follow directives of the TCPs (Traffic Control Person).

Recommended drop-off / pick-up areaUniversity Blvd Lot (6131 University Boulevard Vancouver, BC) is currently the best option for those visitors looking to do a quick drop-off / pick-up to/from the UBC Aquatic Centre.

UBC Vancouver CampusThe UBC’s Point Grey campus is consistently growing and changing – visitors may encounter construction and road closures. The link below will help you locate existing construction areas and road closures at UBC Vancouver. It is updated regularly to make navigating campus easier: UBC Construction & Transit Updates

UBC Aquatic Centre – Other information:

Visitors are reminded to consult the UBC Aquatic Centre facility schedule prior to any visit as schedules are subject to change.